Sheet piling construction animation

Sheet piling construction needs to choose the correct piling method, piling machines and pipeline segment partition, which make enough rigidity and good waterproofing for the sheet piling wall.

The straight sheet piling wall supplies the demand of basic construction, and requires sealing and fold for closed type sheet piling. After every preparation in place, put the manufactured gauge pile accurately and vertically in the steel pipe pile of drilling platform, and then use I-steel beam welding firmly for insuring the verticality of the first sheet piling.

In the whole construction process, always use ball hammer to keep the verticality of every sheet piling, and timely use lifting jack, wooden wedge and leading chain to adjust.

This article comes from gi3d edit released

By Product

Contact Us

SHANDONG CT SHEET PILING CO.,LTD

Tel: 0086-635-8888 104

Fax: 0086-635-8888 204

Email:terry@cncdsteel.com

Email: max@cncdsteel.com

Head Office Address:Chuangye Building,TEAD,LiaoCheng,ShanDong,China

 Factory Address: High Tech Equipment Industrial Park, LiaoCheng , ShanDong,China

Website: http://www.sheetpile-china.com