What are the requirements for the height of the sheet pile

There are two cases of sheet pile cofferdam, one is for the water cut cofferdam, one is used for retaining cofferdam. We all know that steel piles can be used for flood control, anti-debris flow, etc., sheet pile water canal is often used, then you understand the sheet pile for sale waterstuff cofferdam construction on the height of what? And look at the following description.

The height of the cofferdam of the sheet pile for sale must be higher than the maximum water level that may occur during construction, including the height of the wave, at least 0.5-0.7 meters above it. The shape of the steel-plate pile-water-forcing cofferdam must take into account the depth of the water and the velocity of the water flow and the erosion of the sheet pile for sale. For the channel, the diversion, the flexible choice of circular, rounded, rectangular, triangular rectangle Appearance. If the water flow on the sheet pile for sale erosion intensity is relatively large, should be set anti-erosion facilities.

The safety work of steel plate pile water - stopping cofferdam must be put in the first place and prevention should be the main. The construction workers need to strengthen the safety of ideological education, construction workers must hold the relevant documents on duty, without training, and no relevant documents can not participate in the work.

The construction of the steel plate pile water-tight cofferdam must ensure that the elevated cableway has sufficient capacity to withstand the capacity of the lifting capacity in order to ensure the safety of the elevated ropeway. Piling machine main frame easy to attract the wind, need to use wave rope fixed, otherwise the pile frame rocking will lead to serious safety accidents. When the staff in the piling machine and the water guide ring, must be required to wear a seat belt, and wear helmets.

After the construction of the sheet pile for sale, the need for special technical personnel to carry out routine inspection and maintenance work, the use of cableway when there must be professionals in the next command, to avoid many people miscellaneous, and security risks.

This article comes from sheet-piles edit released

By Product

Contact Us

SHANDONG CT SHEET PILING CO.,LTD

Tel: 0086-635-8888 104

Fax: 0086-635-8888 204

Email:terry@cncdsteel.com

Email: max@cncdsteel.com

Head Office Address:Chuangye Building,TEAD,LiaoCheng,ShanDong,China

 Factory Address: High Tech Equipment Industrial Park, LiaoCheng , ShanDong,China

Website: http://www.sheetpile-china.com