Grand Steel Piling

sheet piles,KD7505,KD7506,KD7506.5,KD7507,KD7507.5,KD7508,KD7509

 

Section

reference

Dimensions

Mass

Per meter of wall

Width

Height

Thickness

Single pile

Wall

Section Modulus

Moment of inertia

w

h

t

s

   

W

I

mm

mm

mm

mm

kg/m

kg/m2

cm3/m

cm4/m

CR430

D22601

330

34

3

3

9.72

29.45

40

68

CR435

D28130

330

34.50

3.5

3.5

11.34

34.36

46

79

CR440

D12889

330

35

4

4

12.96

39.29

52

91

CR445

D28233

330

35.50

4.5

4.5

14.53

44.04

57

103

CR450

D22864

330

36

5

5

16.09

48.76

63

114

KD400/5

D28478

400

49

5

5

18.52

46.30

84

208

KD400/5.5

D28404

400

49.50

5.5

5.5

20.37

50.92

91

229

KD400/6

D28384

400

50

6

6

22.23

55.57

99

250

KD500/5

D28472

500

49

5

5

22.45

44.90

86

215

KD500/6

D28473

500

50

6

6

26.94

53.88

101

258

KD600/6

D28090

600

78

6

6

37.50

62.00

184

718

KD600/8

D27909

600

80

8

8

50.00

83.00

237

947

KD600/9

D62651

600

81

9

9

55.53

92.55

263

1066

KD750/5

D62650

742

91

5

5

33.79

45.54

163

745

KD750/6

D62634

742

92

6

6

40.90

54.66

194

893

KD750/6.5

D62676

742

92.50

6.5

6.5

43.72

58.90

209

967

KD750/7

D62635

742

93

7

7

47.03

63.40

224

1042

KD750/7.5

D62677

742

93.50

7.5

7.5

50.30

67.80

239

1116

KD750/8

D62632

742

94

8

8

55.56

72.18

254

1197

KD750/9

D62685

742

95

9

9

60.26

81.21

283

1346

 

Sheet pilesKD750/5 D62650 are to be as watertight as possible to create a dry KD750/7 D62635,KD750/7.5 D62677 environment for construction KD750/6 D62634,KD750/6.5 D62676 are work to take place. For the caisson, KD 750/7.5,KD 750/8 have virtually the same job. It is a structure built to help workers construct on top of water, such as building bridges.Cofferdam KD 750/9 is to change the path of the water into another route, so the construction team could start their work on the foundation and then the body of the dam itself, of course KD 750/5 could be any other kind of structures.

The KD750/8 D 62632,KD750/9 D62685 are also used on occasion in the shipbuilding. and ship repair industry. when it is not practical to put KD 750/6 ship in drydock for repair work or modernization. Construction workers who leave the pressurized environment of the KD750/6.5 must decompress at a rate that allows symptom-free release of inert gases dissolved in the body tissues if they are to avoid decompression sickness, a condition first identified in caisson workers, and originally named KD750/7.5,KD750/8,KD750/9 in recognition of the occupational hazard.

The trench sheet KD 750/5,KD 750/6 are used in bridge KD 750/6.5,KD 750/7 or any other structure in water. a dewatering solution is crucial to completing the project successfully. A cofferdam becomes KD750/7,KD750/6 uneconomical in cases where the plan area of the foundation work is small as compared to the depth of water. KD 750/7.5,KD 750/8,KD 750/9 such circumstances. KD750/5 would prove to be the most suitable.

By Product

Contact Us

SHANDONG CT SHEET PILING CO.,LTD

Tel: 0086-635-8888 104

Fax: 0086-635-8888 204

Email:terry@cncdsteel.com

Email: max@cncdsteel.com

Head Office Address:Chuangye Building,TEAD,LiaoCheng,ShanDong,China

 Factory Address: High Tech Equipment Industrial Park, LiaoCheng , ShanDong,China

Website: http://www.sheetpile-china.com