Sheet pile walls are retaining walls constructed to retain earth, water or any other filling materials. These walls are thinner in section compared to masonry walls. Sheet pile walls are generally used for following:
1. Water front structures, i.e. in building wharfs, quays and piers.
2. Building diversion dams, such as cofferdams.
3. River bank protection.
4. Retaining the sides of cuts made in earth.
Sheet pile walls can be of timber, reinforced concrete or steel.
Steel sheet piles are most commonly used. Steel sheet piles possess several advantages over other piles. They are:
1. Steel sheet piles are resistant to high driving stresses.
2. They are lighter in section.
3. They can be used several times.
4. They can be used either below or above water and have long life span.
5. Suitable joints can be provided to have a continuous wall.
5. The pile length can be increased either by welding or bolting.
Reinforced concrete sheet pile is precast concrete members, usually with a tongue and groove joints. Typical section of the RCC sheet pile is shown in figure below. These piles are relatively heavy and bulky. They displace large volumes of solid during driving. This large volume displacement of soil tends to increase the driving resistance. Due to this reason, suitable reinforcement is provided considering large driving stresses.
Sheet pile is often connected together in pairs and installed using one of three methods:
Vibration: this is the most common method. The first sheet pile of the wall is installed into the ground. A vibratory hammer with clamp is attached to the top of the second sheet pile, which is then interlocked with the first sheet pile, and the sheet pile is vibrated into the ground.
Pressing: sheet pile can also be pressed into the ground when noise hindrance and vibration would otherwise cause problems. This, however, takes longer and is expensive. The sheet pile is pressed into the ground by a hydraulic machine.
Excavation: sheet pile can also be excavated into the soil. A long trench is excavated which is then filled with cement bentonite (a thin concrete slurry) to prevent the walls from collapsing. The sheet pile is then installed in the trench and the cement bentonite is allowed to set.