Grand Steel Piling

Convention Centre Bridge-Piling, Melbourne, Australia

2510 tons of CDU 685x402x10 Length varying from 11.5m to 20m. supplied in welded pairs. slinging holes.The soils consisted of firm to stiff sandy clay and the working load was 100kN. Access to the site for plant and materials was only possible by floating craft, and a temporary wharf 2 miles upstream was used for loading all plant and materials. A spud leg piling pontoon, made up of 20 uniflotes, was constructed for carrying the piling plant and a further 6 flote pontoon was made up and used for transporting materials. A 250HP workboat was used to move and position the pontoons.

Project Photos

21-640-640.jpg
23-640-640.jpg
24-640-640.jpg


Previous: No data

Next: Portsmouth docks, UK

By Product

Contact Us

SHANDONG CT SHEET PILING CO.,LTD

Tel: 0086-635-8888 104

Fax: 0086-635-8888 204

Email:terry@cncdsteel.com

Email: max@cncdsteel.com

Head Office Address:Chuangye Building,TEAD,LiaoCheng,ShanDong,China

 Factory Address: High Tech Equipment Industrial Park, LiaoCheng , ShanDong,China

Website: http://www.sheetpile-china.com